Whether a pigging system pays off depends above all on how much product is lost today and what it is worth. Further savings may be added, but should be assessed with caution.

The most important factors

  • Line contents: determined by the inside diameter, length and product density.
  • Current loss: what proportion of the line contents is actually lost today?
  • Recoverable proportion: how much of this can the pigging system additionally recover?
  • Product value: the economic value of the recovered product according to your valuation approach, for example production cost or contribution margin.
  • Frequency: product changeovers or pigging operations per day and operating days per year.

Further possible benefits

These points depend heavily on the plant and should be assessed individually. Time savings only translate into money if the time gained is actually used or costs actually fall. And nothing may be counted twice: if the product value already includes disposal costs, these do not appear again as a saving.

  • One line for several products instead of several parallel lines
  • Less cleaning agent and waste water
  • In some cases, trace heating can be omitted because the line is empty after transfer
  • Shorter residence times for products that should not remain standing in the line

Costs on the other side

The investment is offset by running costs: propellant, energy, maintenance and replacement pigs. Only the net benefit after deducting these costs gives a reliable calculation. Additional costs also arise from a piggable design of the line and from the level of automation.

Simple payback calculation

Payback period in months = investment ÷ annual net benefit × 12. This calculation does not take account of discounting, financing or taxes and is intended as initial guidance.

With the ROI calculator you can carry out this calculation with your own values and then have the result technically reviewed by us.

Technical basis in addition to our own documentation: G. Hiltscher, W. Mühlthaler, J. Smits: Molchtechnik. Grundlagen, Komponenten, Anwendungstechnik [Pigging technology: fundamentals, components, application engineering; in German]. Wiley-VCH, Weinheim 1999. Information reproduced in substance; guide values from the literature do not replace a case-by-case design.